How can I prevent track out from a hazardous soil excavation project?

An eastern U.S. contractor preparing to do excavation on a site with hazardous material in the soil wanted to prevent tacking any possible material off of the jobsite. Rain for Rent installed a Conline Wheel Wash system that would provide up to 150 daily truck movements for medium soiling even in bad weather. The solution proved efficient as the contractor had portability for future relocation with the Wheel Wash system.